Austrian furnace order

Austrian furnace order

Germany’s HORN Glass has received an order for the cold repair of furnace two at the Stoelzle Glass Group’s Koflach plant in Austria.

This 93.75m² end-fired furnace serves six forehearths for the production of container glass.

In the future, the plant will produce 270 tonnes of flint glass per day.

The existing furnace will be enlarged and equipped with replacement heating equipment and safety control. Furthermore, it will be equipped with an advanced boosting system, an HVR 700F-2P batch charger and further furnace equipment.

www.hornglass.com

Published: 
17/12/2020

Hot Topics